lynxking Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope 15ft for Small Medium Large Dog

Customer rating ★★★★★ 4.2 stars

Imported from USA | Ships in 10 working days

5% additional discount on UPI | Cash On Delivery available

1

₹5890 -32% ₹4000/-

The price at cart2india.com is inclusive of custom duties, GST, freight forwarding and other charges.

Free Shipping across India. Powered by BlueDart.
EMI and GST Invoice available.

Product Information


Specification
Brand : Lynxking
BulletPoint1 : SUITABLE THICKNESS CHECK CORD: To find a balance between weight and strength. 3/8” is a suitable thickness for long training dog leash, it has both strength and portability
BulletPoint2 : NO TANGLE LONG ROPE LEASH: the round climbing rope and 360 degree rotating clasp design long training leash will not tangle whether it is in use or when you roll it up, great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls, and swimming
BulletPoint3 : LIGHTWEIGHT AND NOT ABSORB WATER: soft and lightweight Non-absorbent material won't get more and more heavy in the water and won’t sink, it will float when submerged and highly visible against any background.
BulletPoint4 : SOFT AND DURABLE DOUBLE LAYER WOVEN HANDLE: check cord has a comfortable woven double layer handle, the joint of the rope is sewn by the machine and is very strong.
BulletPoint5 : SIZE: 3/8" (9.5 mm) in diam ,Size of this one is 15foot,color Black, by 10 foot 15 foot, 30 foot and 50 foot three length for different training purpose
Color : Black
DogBreedSize : small
DogBreedSize1 : medium
DogBreedSize2 : large
DogBreedSize3 : small
ExternallyAssignedProductIdentifier : 00850051733842
ExternallyAssignedProductIdentifier1 : 698775350804
ExternallyAssignedProductIdentifier2 : 732463161911
ExternallyAssignedProductIdentifier3 : 0732463161911
ExternallyAssignedProductIdentifier4 : 0698775350804
GpsrSafetyAttestation : 1
IncludedComponents : leash
ItemName : lynxking Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope 15ft for Small Medium Large Dog
ItemPackageDimensions_Height : 30.2 centimeters
ItemPackageDimensions_Length : 6.2 centimeters
ItemPackageDimensions_Width : 15.3 centimeters
ItemPackageQuantity : 1
ItemShape : Rectangular
ItemTypeKeyword : pet-training-leads
Manufacturer : Keenleader.,ltd.
Material : Polyester
Material1 : Polypropylene
Material2 : Metal
ModelName : check cord
ModelNumber : LL-1
NumberOfBoxes : 1
NumberOfItems : 1
PackageLevel : unit
PartNumber : LL-1
Pattern : 3/8 inch * 15foot
PetType : dog
ProductDescription : Description:
This dog kennel cover features two entrance doors with roller blinds, allowing your pet to enjoy a clear view and ventilation while inside. Zippers on each door make it easy for your pet to step in and out effortlessly. The cover includes breathable mesh window screens for optimal air circulation, ensuring that the kennel remains comfortable and prevents overheating. Constructed from high-quality 210D silver-coated Oxford cloth, this cover is waterproof, rainproof, dustproof, and sun-proof, offering full protection in all weather conditions. It also provides privacy and comfort, addressing the instinctive needs of dogs for a secure and peaceful space. Lightweight and easy to carry, it comes with a storage bag and is compatible with most standard dog cages.


Item Type: Dog Cage Cover
Material: 210D Silver Coated Oxford Cloth
Color: As shown in the picture
Product Size: Approx. 63.5x50.8x48cm / 25.0x20.0x18.9in
Weight: Approx. 204-230g / 7.2-8.1oz
Application: Pet cage sunshade, waterproof, dustproof cover


Package List:
1 x Dog Cage Cover
1 x Storage Bag

Note:
1. Please allow 1‑2in error due to manual measurement. Thanks for your understanding.
2. Monitors are not calibrated same, item color displayed in photos may be showing slightly different from the real object. Please take the real one as standard.


ProductSiteLaunchDate : 2019-07-20T07:00:00.000Z
Size : rope3/8"x15'
Style : round rope lead
SupplierDeclaredDgHzRegulation : not_applicable
SupplierDeclaredHasProductIdentifierExemption : 1
TargetAudienceKeyword : dogs
TargetAudienceKeyword1 : Dogs
TargetAudienceKeyword2 : dogs
UnitCount : 15
UnspscCode : 10111300
WarrantyDescription : 2 years

Questions & Answers

Have a question? Ask experts

?
No question found

Ratings & Review

Rating Breakdown (average)

5*
6
4*
4
3*
3
2*
0
1*
0

Read all 13 customer reviews

A mixed experience overall.

★★★★★

Practical and effective.

★★★★★

IÕm extremely impressed with this item.

★★★★★

High quality and great value.

★★★★★

Lives up to the hype.

★★★★★

Impressive quality and durability.

★★★★★

IÕd consider buying again.

★★★★★

Best in its category!

★★★★★

Worth the price, satisfied.

★★★★★

Practical and effective.

★★★★★

Meets basic needs, not exceptional.

★★★★★

Just fine for the price, not more.

★★★★★

Performs perfectly and looks amazing.

★★★★★

Have an opinion on this page? Let's hear it.